BUILDING GUIDELINES

 

Enforcement of the Design Guidelines

 

There shall not be constructed, placed, erected or maintained on any lot, any dwelling, building or other improvements whatsoever unless and until plans and specifications thereof showing compliance in all respects with these guidelines and showing elevations, siting, size, colour scheme and all materials to be used have been submitted to and approved in writing by the Developer's authorized agent ("Design Consultant") who shall have the right and power to approve or reject same in accordance with these Design Guidelines.

 

The Design Consultant shall be appointed by the registered owner of the lots (the "Developer"). In the event the Developer wishes to appoint a new Design Consultant, the Developer has the right to do so.

 

To ensure the Design Guidelines are adhered to, a $10,000 compliance deposit (the "Compliance Deposit") is to be paid to the Developer on completion of the purchase of the lot by the Lot Owner. The Developer will hold the Compliance deposit to ensure the Lot Owner complies with the Design Guidelines. This Compliance Deposit will be returned to the Lot Owner, without interest, after a final occupancy inspection is issued by the Sunshine Coast Regional District and the Design Consultant is satisfied that the dwelling conforms to these Design Guidelines and landscaping has been completed.. If the Lot Owner does not comply with the Statutory Building Scheme and the Design Guidelines, the Compliance Deposit will be automatically forfeited to the Developer, without prejudice to any other rights or remedies of the Lot Owner.

 

 