BUILDING GUIDELINES
Landscaping & Fencing
That portion of the lot lying between the lot line adjoining any street and the building line of the dwelling furthest from the street shall be landscaped within a period of 18 months from approval of plans by the Design Consultant, unless prevented by causes beyond the Owner's control.
Whether the Lot is vacant or occupied, it is the responsibility of the Lot Owner to maintain weeds, brush, hedging, trees and other such growth at a minimal level so as not to interfere with the use, enjoyment and view of occupiers of adjoining properties.
No fencing or hedging shall exceed two meters in height and shall not be constructed of wire, chain link or metal.
Retaining walls in excess of 6 feet in height are to be faced with rock, cultured stone or masonry. Rock stack retaining walls shall not be more than two (2) meters in height, without a horizontal step of at least two (2) meters. Rock stack walls require a geotechnical engineer's report for design and approval.
|